Fixed costs, total costs and revenue over volume — for idle capacity, price erosion, extra volume beyond capacity and bottleneck. Pre-filled with cost center 210 and the titanium housing from Chapter 13.

Cost center

Product

Additional order and capacity

Break-even level 1
–
Break-even level 2
–
Actual result
–
Actual full cost
–
Result with additional order
–
Minimum price, entire volume
–
Price floors by situation
Situation€/unitApplies when
Idle, one-off–staff and fixture already in place
Idle, standard case–free hours in the delivery period
Bottleneck: displacement–machine full, vc + CM/h × time
Bottleneck: extra shift–vc + step / volume of additional order
Price for the entire volume–break-even exactly at capacity
Permanent price at actual utilization–full cost vc + F / actual volume