David KrauseDEEN Knowledge Base
Section Knowledge BaseAccess free · no registrationUpdated 10/2026

Knowledge Base

A book that works one reference company through from the income statement to the quoted price — plus articles that deepen individual knots and four tools that calculate right in the browser.

18
Chapters · Edition 1.0
≈ 110 min
Reading time, book
12 · 3
Articles · Tools
Book cover: Cost Accounting for Manufacturing — David KrauseCost Accounting for Manufacturing · Edition 1.0
The calculation chain of the book

Which system for which question?

Full costs tell you what it costs. Partial costs tell you whether it is worthwhile. Activity-based costs tell you why it costs so much. Target costing tells you what it may cost.

SystemQuestion it answersHorizonCost basisRecommended whenTypical mistake
Full costing
Ch. 5–7, 10
What does it cost — and what price do I need in the long run?long-termfull costseries prices, quotations, inventory valuationused for one-off decisions
Partial costing (contribution margin)
Ch. 13
Is it worthwhile now — and does the sum of contribution margins cover fixed costs?short-term per order; per period as fixed-cost coveragepartial costadditional order, make-or-buy, bottleneck, product mixvariable costs used as a permanent price, coverage budget not checked
Activity-based costing
Ch. 9.6
Who drives the overhead: variants, small orders, quotations, purchase orders?medium-termfull costlarge indirect areas, many variants and small ordersintroduced although the indirect areas are small
Flexible standard costing
Ch. 5.10
Who is responsible for the variance: shop floor or utilization?periodfull costbudget with plan-actual comparison, inventory at full costconsumption and volume mixed up
Marginal standard costing
Ch. 5.11
What does one hour more or less cost — and where does the shop floor overspend?periodpartial costhigh fixed-cost share, fluctuating utilization, monthly steeringno full-cost parallel calculation for price and balance sheet
Target costing
Ch. 9.7
What may the part cost if the price is fixed?life cyclemarket-drivenown development or target price from the customertarget cost gap closed by discount instead of by cost
single order · days–weeks period · month–year life cycle · years time horizon of the decision → full cost partial cost Contribution margin order? bottleneck? ch. 13.4 · 13.6 fixed-cost coverage over the period · 13.5 Marginal costing steer variances ch. 5.11 Flexible standard spending vs. volume ch. 5.10 Full costing (BAB/MHR) permanent price, inventory ch. 5–7 · 10 Activity-based variants, small orders ch. 9.6 Target Costing target price backwards job shop: limited ch. 9.7 partial cost full cost market-driven
Map · six systems by time horizon and cost basis

Every cost has an expiry date. Variable costs expire with the order, fixed costs with the contract. Every system freezes a time horizon — the question is whether it fits your decision. Chapter 13.8

Your question Accept order — capacity free? Contribution margin 13.4 Accept order — machine full? CM per bottleneck hour 13.6 Does the year cover fixed costs? Fixed-cost coverage 13.5 Which permanent price? Inventory? Full costing 5–7 · 10 Why is the cost center off? Standard/marginal 5.10 · 5.11 Large overheads, many variants? Activity-based costing 9.6 Target price from market or customer? Target Costing 9.7
Decision tree · from the question to the system and the section

Example companies: where each system fits

Typical company types, not real companies. Headcounts and shares are rules of thumb for orientation.

Full costing
CNC job shop, 30–80 employees
Characteristics
One-offs and small batches to customer drawings, every enquiry a separate quotation.
Why it fits
Every quotation needs full cost per machine hour, and inventory is valued at production cost.
Fails when
utilization collapses and the rates are pushed up — the death spiral from 13.5.
Contribution margin accounting
Injection moulder or die caster with a few large machines
Characteristics
Typically over 60 % fixed costs, fluctuating utilization, frequent requests for extra lots, one large machine as the bottleneck.
Why it fits
Additional orders, make-or-buy and the ranking at the bottleneck can only be decided correctly with variable costs.
Fails when
exception prices become the regular price and nobody checks the coverage budget.
Activity-based costing
Variant manufacturer, e.g. standard or spare parts with thousands of items
Characteristics
Many small orders, large back office; the indirect areas carry a large share of costs.
Why it fits
Costs arise per purchase order, quotation and set-up — not per machine hour.
Fails when
the company has only a few indirect staff: then the effort exceeds the benefit.
Flexible standard costing
Series manufacturer with 150–500 employees, e.g. pumps or gear parts
Characteristics
Annual budget, cost center managers with accountability, semi-finished goods in stock.
Why it fits
The plan-actual comparison per cost center separates what the shop floor owns (spending) from what sales owns (volume).
Fails when
fixed and variable costs are not cleanly separated.
Marginal standard costing
Automotive supplier, e.g. die casting or forging, highly automated
Characteristics
Three shifts, ERP with controlling module, monthly reporting, fluctuating call-offs from carmakers.
Why it fits
With a high fixed-cost share, the planned marginal cost basis decides correctly, and no volume variance distorts the shop-floor figures.
Fails when
no full costing runs in parallel — then quoted prices and the balance sheet are wrong.
Target costing
Maker of its own products in a competitive market, e.g. agricultural machinery or power tools
Characteristics
Market price given, own design, product cycles of several years.
Why it fits
Costs are largely fixed in development; target cost splitting acts before anything is built.
Fails when
a job shop without design authority applies it — there the backward calculation is enough.

Three ways in

Check in 15 minutesWhere does your own costing stand?≈ 11 min · self-test in chapter 8
Build hour ratesFrom the income statement to a sound machine hour rate≈ 36 min · Abgrenzungs-Mapper for chapter 4 (German)
Cost quotationsChoose the method, calculate, post-calculate≈ 25 min
The book

Table of contents

Every chapter works through the same company — Präzisionsteile Muster GmbH, a fictional CNC contract manufacturer. Every figure has an origin, every chain closes.

Part I · Fundamentals Chapters 1–3≈ 14 min
  1. Ch 01Why accounting isn't enoughFinancial accounting tells you what the year brought — not what a part costs4 min
  2. Ch 02The three-stage modelWhich costs? Where incurred? What for? Three questions, three stages — each building on the last4 min
  3. Ch 03The ten most expensive costing errorsTen recurring costing errors that push hour rates 15–35 % off reality — each with a worked example in euros6 min
Part II · Cost-type accounting Chapter 4≈ 9 min
  1. Ch 04From income statement to cost-type planSubject and imputed reconciliation: the four cost categories, what the P&L conceals, and the 24-node cost-type plan for …Tool: Abgrenzungs-Mapper9 min
Part III · Capacity & hour rate Chapters 5–8≈ 32 min
  1. Ch 05The cost center accounting sheetWhere overhead is incurred and at what rate it returns to costing10 min
  2. Ch 06Machine hour rate: the fundamentalsSeparating machine cost from labor cost, the six cost components, replacement value as the depreciation base, and why …9 min
  3. Ch 07Machine hour rate: step by stepA complete MHR calculation in five steps — from replacement value through productive hours to €46.37/MH, with sensitivity …8 min
  4. Ch 08Self-diagnosis and correction calculationsTen questions to your own costing. Each 'no' flags a correction need with a concrete euro figure — derived from the methods of …Tool: Self-test5 min
Part IV · Quotation costing Chapters 9–12≈ 25 min
  1. Ch 09Which costing method fits?Four costing methods, one decision: when a differentiated overhead surcharge is enough and when the machine hour rate becomes …5 min
  2. Ch 10The costing schemeSeven positions from material to invoice price: the full costing scheme on one order, including the lot-size effect and the …7 min
  3. Ch 11Three case studiesThe costing scheme applied to CNC titanium milling, plastic injection molding and aluminum die casting — each with its own …6 min
  4. Ch 12Post-calculation: the plan-actual comparisonWhere the pre-calculation was off and what it cost: plan-actual on the titanium order, variance causes systematized, and the …7 min
Part V · Steering & decisions Chapters 13–17≈ 22 min
  1. Ch 13Contribution margin accountingSplitting cost into variable and fixed answers what full costing cannot: orders below total cost, make-or-buy, break-even …8 min
  2. Ch 14Spindle time instead of machine timeA machine is occupied far longer than its spindle turns. Two views of one machine: the costing rate for quotes, the spindle …4 min
  3. Ch 15Recording tooling costs correctlyFour maturity levels of tool costing, the cost per spindle hour, the regrind posting rule and the scrap credit that quietly …3 min
  4. Ch 16Shift models and labor costThe shift model changes the labor rate — and the machine hour rate the other way4 min
  5. Ch 17Recording planning and CAM costsDirect cost or overhead? The CAM hour rate at full cost, and the lot-size effect that makes programming nearly a third of unit …3 min
Part VI · Digitalization Chapter 18≈ 5 min
  1. Ch 18Digitalizing cost accountingLocal AI in cost accounting: rule before model, three sensible use cases, an ROI that amortizes in under 2.3 months, and why …5 min
Deep-dives

Specialist articles

Twelve deep-dives in four topics — each linked to the chapter it builds on.

Assets & productivity
Costing & contribution
  • Costing scrap and rework correctlyWhy the scrap surcharge is 1/(1−q) and not q, why the moment of detection sets its size, and why rework must be carried separately5 min · builds on Ch 10
  • Toll machining and free-issue materialThe customer supplies the material, we only machine. Why the contribution-margin ratio misleads and the margin per bottleneck …5 min · builds on Ch 13
  • Project costing and cost forecastConcurrent costing in project business: actuals plus commitments plus estimate to complete — seeing the overrun while there is still time to steer.4 min · builds on Ch 12
  • Buying cutting tools by cost per partWhy the more expensive cutter is often the cheaper one: price, tool life, change time and machine hour rate in one figure.4 min · builds on Ch 15
  • The monthly report on one pagePlan-actual with variance commentary: five key figures, spending and volume variance separated, one action with owner and date.4 min · builds on Ch 5
Capital & return
Knowledge, software & AI
Calculate

Tools

Calculate instead of read — all four run in the browser, no sign-up, no data transfer.

  • ROIC calculatorReturn on capital, economic profit and the effect of an investmentbelongs to the ROIC article · chapters 6 and 13
  • Cost curves and price floorsBreak-even, special order, price erosion, step-fixed costs and bottleneck with your own figuresbelongs to chapter 13
How this knowledge base works

All content comes from first-hand professional practice and the author's own records. Material from employment relationships stays confidential — only general expertise appears here, rewritten and worked through on the fictional reference company. Forecasting errors are documented rather than deleted.